top of page
RIVER WORKS
Project of the construction of the 100 km lock in Nubaria Canal (Ministry of Irrigation and Water Resources, 2009):
• Construction of 100 km pipelines of the lock of the Nubaria Canal.
• Our company and the Arab Contractors Company (Othman Ahmed Othman & Co.). we constructed double concrete pipelines as an alternative to the drainage line adjacent to the Nubaria Canal at 100 km as a prelude to the construction work that took place in Lock 100 km in Nubaria Canal.
bottom of page